Residential

Project Details
  • Year: 2014
  • Location: Lake Buena Vista, FL
  • Value: $41,310,070.00
  • Category: Roadway
  • Client: Reedy Creek Improvement District

The Scope of the Project includes the reconstruction and widening of Buena Vista Drive from Hotel Plaza Boulevard to Bonnet Creek Road. The reconstruction will provide dedicated concrete bus lanes from Bonnet Creek to Intersection 2 and other privately owned vehicle lane improvements. In addition, the reconstruction of the road will require: (i) the reconstruction of the bridge over the L101 Canal; (ii) the reconstruction of the storm drain systems; (iii) the relocation and realignment of many of the utility systems; (iv) the reconstruction of traffic signal systems at six intersections; (v) the reconstruction of the roadway lighting systems; (vi) the reconstruction of the roadway signage and graphics; and (vii) the redevelopment of the landscape and irrigation systems.

 

 

Project Details
  • Year: 2015
  • Location: Osceola Parkway, FL
  • Value: $3,425,132.00
  • Category: Residential
  • Client: Lennar Homes, LLC

The Excavation, storm drainage system, underground utilities, lift station, curb, sidwalks, paving, striping and signage for residential subdivision