JR Davis Construction Home Projects Estimating Employment Contact Us
Projects
*Featured Projects*   Current Projects   Completed Projects
Roadway Projects   Residential Projects   Commercial Projects

Hoagland Boulevard

  • Year: 2012
  • Client: Osceola County
  • Location: Kissimmee
  • Contract Amount: $5,671,000
  • Details: Widening from a two-lane rural section to a four-lane divided urban section with bike lanes, sidewalks, bike path, sodded and raised concrete medians. Work includes excavation of on-site and off-site retention ponds, reuse water main, watermains, force mains, gravity walls with pedestrian handrail, lighting, signing, pavement markings and various intersection improvements.
 

East-West Road - From 33 at Pace Road, Polk County Parkway

  • Year: 2012
  • Client: FDOT - District 1
  • Location: Lakeland
  • Contract Amount: $21,118,971.00
  • Details: Design-Build of a new four-lane suburban roadway. The project has six miles of roadway including two million yards of earthwork, 40,000 LF of storm sewers and 300,000 SY of base and paving; 200,000 CY of surcharges and 125,000 SY of GeoTextile soil reinforcement.
 

Narcoossee Road (Boggy Creek to 417)

  • Year: 2011
  • Client: Lake Nona Boggy Creek, LLC
  • Location: Orlando
  • Contract Amount: $18,095,199
  • Details: 3.82 miles of six-lane divided urban reconstruction and included clearing, subsoil excavation, grading, stabilization, base, milling, retaining walls, box culverts, drainage, riprap, underground utilities.
 

John Young Parkway/Osceola Parkway

  • Year: 2011
  • Client: Osceola County
  • Location: Kissimmee
  • Contract Amount: $22,285,700
  • Details: The project consists of widening John Young Parkway two miles, from four to six lanes, including the flyover bridge at Osceola Parkway. Project included widening ½ mile of Osceola Parkway. The utility improvements for this project included the construction of a 16-inch reclaimed water main and 12-inch water main.
 

Buena Vista Dr. at Hollywood Studios

  • Year: 2012
  • Client: Reedy Creek Improvement District
  • Location: Lake Buena Vista
  • Contract Amount: $2,263,000
  • Details: 0.62 mile of lane widening of Buena Vista Drive from Studio Drive to Victory Way, includes drainage, lighting, camera system, traffic separators, pavement markings, signage and irrigation.
 

Alafaya Trail

  • Year: 2012
  • Client: Orange County
  • Location: Orlando
  • Contract Amount: $30,811,132.00
  • Details: Four miles of four-lane divided urban reconstruction of Alafaya Trail from Avalon Park Blvd. to Mark Twain Blvd. that included clearing, subsoil excavation, demolition, excavation, embankment, grading, stabilization, base, milling, gravity walls, drainage, paving, signage, signalization and utilities.
 

Click here to go back to previous page